Image
PM Lucas has finished drilling of two wells for Petrokazakhstan

PM Lucas has finished drilling of two wells for Petrokazakhstan.

SkyTop 

PM Lucas has finished drilling of two wells for Petrokazakhstan.

Maybulak M-31 well was drilled by TD-125 rig, completed in 31 days, TVD reached 1503m.  

Aryskum A-30 well was drilled by TD-160 rig. TVD reached 2430m.  

 

Up to today PM Lucas has drilled 10 wells as a part of this Campaign with total of 15581m drilled.

 
< Prev   Next >