Image
PM Lucas receives the first of 4 – 2.5 MW Gas Turbine Generators
First Gas Turbine package received in Aktau.  
 
 Gas Turbine Generator 2.5 MW
 Gas Turbine Generator 2.5 MW
 
< Prev   Next >